免费播放移动黄色欧美视频|欧美日成人视频在线|成人免费观看一级片,日韩成人黄色在|亚洲色图。欧美色图,精品推荐|aa免费视频A毛片基地|一级电影日韩啊啊啊在线免费|欧美午夜久久伊人|免费黄色在线视频在线观看|免费看a级毛片欧美日V|超碰超碰超碰人人

ACEG’s First Investment in Yangtze River Bridge Project
  |  Updated: 2024-12-25  |  Views: 3657

Recently, ACEG won the S24 Hangzhou to Hefei Expressway Wuhu Taishan Road Yangtze River Bridge and Connection Works, which is ACEG's first investment in Yangtze River bridge project.

With total investment of about RMB15.5 billion Yuan, 48 months of construction period and 356 months of toll-charging period, it has 30.88km of main line and 14.35km of connection line. The starting point crosses with G4231 Nanjing–Jiujiang Expressway and the ending point with G4211 Nanjing–Wuhu Expressway with 4 toll stations and six locations of interconnection along the whole route.

Included in "Layout Planning of Crossing Passages for Yangtze River Trunk Line (2020-2035)", the project can effectively improve the local expressway network and promote economic and social development along the route. Upon completion, it will play an important role in implementing the national strategy of integration of Yangtze River Delta, promoting high-quality development of Yangtze River Economic Belt.

Since 2024, ACEG has focused on high-quality market development, and successively invested in a number of major franchise projects in Anhui province, achieving reasonable growth in quantity and effective improvement in quality, continuously accelerating ACEG’s development featuring transformation, high-quality and large-scale.