免费播放移动黄色欧美视频|欧美日成人视频在线|成人免费观看一级片,日韩成人黄色在|亚洲色图。欧美色图,精品推荐|aa免费视频A毛片基地|一级电影日韩啊啊啊在线免费|欧美午夜久久伊人|免费黄色在线视频在线观看|免费看a级毛片欧美日V|超碰超碰超碰人人

ACEG Algeria Branch / Two pieces of project news
ACEG Overseas  |  Updated: 2019-05-17  |  Views: 6911
The Military Academy Project
Concrete has been poured for the foundation of the first plot
 
Through joint efforts of all the Project staff and the cooperation and supports from the Owner and the Engineer and the Supervision Bureau of Quality of Algeria, the concrete pouring work for the foundation of the first plot of the Project has been completed satisfactorily at 3 am on May 1 local time.
 
The work started at 1 pm on April 30 and a total volume of 483 cu.m. concrete has been poured. The Project has overcome various difficulties and adverse conditions and completed the work with careful layout and strict management and reasonable arrangement and two shifts in turn have been implemented for all the processes of the concrete pouring and the technical director, together with the foremen have made fine technical clarifications and clear foundation concrete pouring method details to ensure that the concrete strength, concrete curing and crack control measures matching the requirements.
 
 
 
 
 
Ain Defla Spa Hotel Project
Concrete pouring work for the foundation beds finished
 
May 13 morning local time, the Project of Ain Defla Spa Hotel has completed the concrete pouring work for the foundation beds marked No.15 up to No. 17.
 
The Hotel is located in a remote desert hinterland; the climate there is hot with sandstorms. In order to guarantee the construction quality and speed up the construction progresses, the staff with the Project have managed to make the concrete pouring at the time when it is less hot, the project managers have joined the working teams because short of hands at the site and the orderly pouring processes were ensured.